Electrical Loads Are Being Evenly Redistributed
2026-02-10 12:00:00 / News

The Fergana District power supply enterprise is carrying out a technical inspection of the electrical networks connected to Transformer Point No. 137 located in the “Boy Mahalla” citizens’ assembly area. At the same time, based on a reassessment of the existing loads, work is underway to redistribute them evenly.
These technical measures are aimed at ensuring consumers receive a stable supply of electricity throughout the season. They are also intended to prevent possible emergency outages that could occur due to overloads in the network.
