How many points are awarded to a construction company for employees, financial indicators, machinery, and certificates?
2026-01-08 10:00:00 / Ministry news

Shaffof qurilish: How many points are awarded to a construction company for employees, financial indicators, machinery, and certificates?
Points awarded for employees of a construction organization?
General Director – 1 point
Chief Engineer – 1 point
Project-estimate engineer or cost estimator – 1 point
Technical documentation engineer – 1 point per specialist, total 2 points
Occupational safety and labor protection engineer – 1 point
Construction supervision engineer or production and capital construction engineer or inspector for acceptance of construction and installation works and their quality – 1 certified specialist = 1 point, for 2 or more specialists = 2 points
Chief surveyor or surveyor or engineer-surveyor or engineer for geodetic works – 1 point
In addition, based on the number of employees working in the organization, a maximum of 10.4 points is awarded.
These data are obtained automatically from the Ministry of Poverty Reduction and Employment.
Points awarded to a construction organization based on financial indicators
Accrued income amount for individuals – 5 points (based on financial year results)
Net revenue from sales – 1.5 points (the best result over the last 3 years is taken into account)
Amount of VAT paid – 4 points (the best result over the last 3 years is taken into account)
Paid profit tax – 4 points (based on financial year results)
Number of facilities put into operation – 3 points (according to the monthly rating update)
Value of facilities put into operation – 3 points (according to the monthly rating update)
❗️Points are calculated using the interpolation method, where the company with the highest indicator receives the maximum point.
These data are obtained automatically from the Tax Committee and the Republican Center for the Development of Information and Communication Technologies.
How many points are awarded for the operating period of a construction company and its position in the stability rating?
A company that has been operating for 5 years or more is awarded 6 points. Points for intermediate indicators are calculated using the interpolation method.
Points for the position in the stability rating are determined by calculating 6 percent of the company’s total points in this rating. For example, if the company’s score in the stability rating is 70, it receives 4.2 points in the builders rating. 70*6%=4.2 points.
In addition, the company is awarded 0.8 points for each of the international certificates ISO-9001, ISO-45001 and ISO-14001.
These data are obtained automatically from the Tax Committee and the Agency for Technical Regulation.
How many points are awarded to the construction organization for the following machinery?
Cargo machinery
with a power of 50–100 horsepower, a load capacity of 500 kg or more, manufactured up to 15 years ago – total 2 points
(0.5 points are awarded for 1 unit of machinery. From 2 to 6 units of machinery, 0.1 points are added for each unit, a total of 0.5 points is added. The organization with the largest number of machinery receives an additional 1 point)
with a power of 50–100 horsepower manufactured 15–30 years ago – total 1 point
(the organization with the largest number of machinery receives 1 point)
with a power of 100 horsepower or more, manufactured up to 15 years ago – total 3 points
(1 point is awarded for 1 unit of machinery. From 2 to 11 units of machinery, 0.1 points are added for each unit, a total of 1 point is added. The organization with the largest number of machinery receives an additional 1 point)
with a power of 100 horsepower or more, manufactured 15–30 years ago – total 2 points
(0.5 points are awarded for 1 unit of machinery. From 2 to 6 units of machinery, 0.1 points are added for each unit, a total of 0.5 points is added. The organization with the largest number of machinery receives an additional 1 point)
Load lifting machinery
with a power of 50–100 horsepower, manufactured up to 40 years ago – total 2 points
(0.5 points are awarded for 1 unit of machinery. From 2 to 6 units of machinery, 0.1 points are added for each unit, a total of 0.5 points is added. The organization with the largest number of machinery receives an additional 1 point)
with a power of 100 horsepower or more, manufactured up to 40 years ago – total 3 points
(1 point is awarded for 1 unit of machinery. From 2 to 11 units of machinery, 0.1 points are added for each unit, a total of 1 point is added. The organization with the largest number of machinery receives an additional 1 point)
Concrete mixer truck
with a power of 100–200 horsepower, manufactured up to 15 years ago – total 2 points
(0.5 points are awarded for 1 unit of machinery. From 2 to 6 units of machinery, 0.1 points are added for each unit, a total of 0.5 points is added. The organization with the largest number of machinery receives an additional 1 point)
with a power of 200 horsepower or more, manufactured up to 15 years ago – total 2 points
(1 point is awarded for 1 unit of machinery. From 2 to 11 units of machinery, 0.1 points are added for each unit, a total of 1 point is added. The organization with the largest number of machinery receives an additional 1 point)
Concrete pump truck
with a power of 100–150 horsepower, manufactured up to 20 years ago – total 1 point
(0.5 points are awarded for 1 unit of machinery. The organization with the largest number of machinery receives an additional 0.5 points)
with a power of 150 horsepower or more, manufactured up to 20 years ago – total 3 points
(1 point is awarded for 1 unit of machinery. The organization with the largest number of machinery receives an additional 2 points)
❗️Intermediate indicators are calculated using the interpolation method.
Information about the above machinery is provided by the Traffic Safety Service. Points are awarded for machinery that has passed technical inspection and is in working condition.
The Committee for Industrial, Radiation and Nuclear Safety and the Agro-Industrial Control Inspection also provide information about machinery.
In addition, the National Statistics Committee provides information on the material and technical base of the construction organization, and the Republican Center for Examination of Urban Planning Documentation under the Ministry of Construction provides information about the construction activities of the organization.